EPC & Pre-Commissioning of ASAB Unit 6 & 7 Project

ADCO ASAB / CPECC

Completed

Fitting & Installation of Mechanical Eqpt, Cold Cutting, Installation & Maintenance of Electrical Equipment, SS Piping erection works.

Installation of 20” Gas  Pipeline 47 KM with valve stations and launcher/receiver

CAT/NPCC

Completed

Installation of Gas Pipeline 20” with launcher and receiver facility, valve stations, Civil works for valve stations etc.

Group III Base Oil Production Facilities

Hyundai Eng. Co. Ltd

Completed

Pipe Fabrication & Mechanical Maintenance, Welding and E & I Works

TAKREER RRE U & O PROJECT

Samsung Eng Co Ltd

Completed

Technical Resources for Commissioning Support, Maintenance of Rotary Equipment, Electrical Support, Calibration of Control Systems

Tankage & Inter connecting Pipeline

Daewoo E &C

Completed

Piping Fabrication and erection of 40,000 Dia inch, Eqpt. Erection, Inspection, Servicing, Maintenance, Testing & Commissioning

Maintenance of Ammonia Storage Tank T-4102

Fertil

Completed

Tank Cleaning, Piping fabrication & erection,  Valve maintenance, E & I Works, Blinding & De-blinding, Hydro Testing & Pre-Commissioning

Flare Tips Replacement at ADCO BAB

ADCO / Dome Oilfields

Completed

Construction of Civil foundations, Mechanical & Piping Works, Scaffolding & Risk Assessment, Electrical and Control Works & Replacement of Tip Flare, Pre- Commissioning

GASCO Ruwais, Shutdown

Emdad Services LLC

Completed

Plant Maintenance, Overhauling, Fabrication & Erection Works, Maintenance of Mechanical Equipment, Vessels, Column, Welding Works & E & I work

Warranty Shutdown Of Green Diesel Plant

Takreer / GS Engineering

Completed

Overhauling Of Heat Exchanger, Blinding Of HE, Removal Of Damaged Studs & Rectification Of Internal Threads, Helium Leakage Testing & Hydro-testing

ZADCO Shutdown

ZADCO / Siged Emirates

Completed

Plant Maintenance, Overhauling, Fabrication & Erection, Maintenance of Mechanical Equipment, Vessels, Column, Welding Works

Technical Training Institute For ADMA-OPCO At Al Shamkha

Petrofac / Dome Dz

Completed

Assembling & Installation of Skids, Replacement of Mechanical Equipment, Painting, Insulation, Hydro Testing & Pre-Commissioning

GASCO ASAB, Shutdown

Emdad Services LLC

Completed

Pipe Fabrication & Mechanical Maintenance, Welding and E & I Works

ADGAS Shutdown

Qcon Engineering

Completed

Plant Maintenance, Overhauling, Fabrication & Erection Works, Maintenance of Mechanical Equipment, Vessels, Column welding