PROJECTS

CLIENT

STATUS

SCOPE OF PROJECT

  1. Balance Civil Works for 24” Pipeline (PAC-1).
  2. De-Commissioning of 16” Condensate Pipeline (109 KM) from Habshan to Ruwais.
  3. Demolition of 16” Condensate Pipeline from Habshan to Ruwais(109KM).

ESSAR / ADNOC GAS Processing

Ongoing

ESSAR Project comprised of three packages. One is for Balance Civil Works for new 24” Condensate Pipeline. Second package is of Decommissioning of existing of 16” condensate pipeline from Habshan to Ruwais.

Installation of flow lines for well heads in Qashawera

Al-Ashfaq/ADCO

Ongoing

Installation of flow lines including civil works at Qashawirea.

CMEI works for HP Flare Modification works ADCO ASAB

Petrofac/ADCO

Ongoing

Survey, civil works for seal drums foundations, make up pit and piping works. Pre-fabrication and Installation of CS/LTCS/SS/SDSS Piping for more than 25,000 Dia inch including painting, hydro-testing and pre-commissioning works. Tie-in works related to HP Flares 

Maintenance of GAS Oil Storage Tanks

GS E&C/ ADNOC Terminal

Ongoing

Blinding, removal of oil, Tank Cleaning by water jetting, removal of sludge, maintenance works, De-blinding.

Replacement of RA Heating Medium Vessel & NEB Flare Headers

Gasco/Adnoc

Ongoing

  1. Ramaitha – HM Vessel Replacement and HP/LP/ Cold common Flare Header Piping Replacement.
  2. Dabbiya – Flare Header Piping Replacement Works.

Interconnecting Feed of the condensate stabilization Units

Gasco/Adnoc

Ongoing

Installation of Piping for bypassing condensate stream.