• Installation of Pipes
  • Fitup, welding of pipeline, starting size from 2” to 56” tie-in (using manual/semi auto method)
  • Tie-in of pipeline- normal joint and temperature tie-in
  • Pipeline Demolition
  • Spools Fabrication
  • Above ground/underground Site installation
  • Metallic/non-metallic piping
  • Pipelines/flowlines installation
  • Brown field modifications
  • Hot and cold tie-ins
  • PWHT/NDT
  • Painting/insulation
  • Hydro test
  • Erection of Valve Stations, Pumps Stations, Scrapper/Louncher, Scrapper handling unit associated to Gas/Liqued pipeline projects
  • Positive Isolations
  • Pigging operations
  • Venting & drainage